Saturday, January 21, 2012

The Work Continues: slowly but surely

Removing the rotted out floor

lookin' out my back door


the holes in the floor are being fixed. 




sealing the door sill with foam

the floor is now fixed!

the floor is almost ready for the skim coat.

the floor stuff called "skim coat" is what makes it level over all the previous floor gunk

the hallway needed extra skimcoat, it was bumpy!






























Next up is floor cement board, re-screwing down the 6" apart screws and the floor is done except for radiant floor installation and tile. (planks on a diagonal)

now the final planning for plumbing and electrical can go in.
Should there be lights over the bathtub and the vanity? on separate switches?
Where should the radiant floor go? How much? into the hallway?

If the rain shower head is centred over the non-sloped area of the tub,  how far away would the light be if it is centred on the ceiling?

The bathroom configuration has been changed twice,  think we will have to move in the vanity at least to make a final decision. eeeps!!!