My new office.
before and almost after.
Things done:
- foam wall paper border removed
- carpet and underlay removed, staples and nails removed
- walls painted, trim painted
- furniture removed
- blinds removed
Still needs:
- another coat of paint on the window sill
- base board quarter round trim
- new light fixture.
- ceiling painted
- patio door replaced
- frost window and install blackout shade
Details:
walls: Benjamin Moore Aura paint simply white in semi-glass (for durability). The expensive paint and glossiness covered deep burgundy in two coats!
trim: Benjamin Moore simple white in gloss
floor: refinished original wood, with minwax oil based (smelly) stain, 4 coats
Showing posts with label before. Show all posts
Showing posts with label before. Show all posts
Monday, July 23, 2012
Monday, January 16, 2012
the bathroom "Before"
![]() |
| looking into the bathroom from the kitchen. that rim is the new clawfoot tub, hanging out in the kitchen. |
![]() |
| looking into the hallway, from the bathroom. |
![]() |
| the view as you walk into the bathroom |
![]() |
| the view to the left when you are standing in the bathroom doorway |
![]() |
| the blue tub and shower insert |
![]() |
| the vanity and closet |
![]() |
| more of the shower with plastic wall insert |
![]() |
| the window and towel bar |
| hello vanity and mirror, can you sense your upcoming demise? |
![]() |
| looking out the bathroom, from the tub. |
Subscribe to:
Posts (Atom)









